Search

You searched for: Start Over Photos Remove constraint Photos Author Hopkins, R.S. Remove constraint Author: Hopkins, R.S. Subject Pumping Plant A (California) Remove constraint Subject: Pumping Plant A (California)

Search Results

  • 1443
    KP-1101 - R2 - Klamath Project. It is ready for backfilling; March 23, 1945; Photo by R. S. Hopkins
    Citation
  • 1444
    KP-1102-R2 - Klamath Project; March 23, 1945; Photo by R. S. Hopkins
    Citation
  • 1445
    KP-1103-R2 - Klamath Project; March 23, 1945; Photo by R. S. Hopkins
    Citation
  • 1459
    KP-1117-R2 - Klamath Project - Tule Lake Division; April 17, 1945; Photo by R. S. Hopkins
    Citation
  • 1433
    KP-1091-R2-Klamath Project - Tule Lake Division - Modoc Unit. The transition structure here is the head of the "M" Canal and is set mostly in backfill; January 29, 1945; Photo by R.S. Hopkins
    Citation
  • 1438
    KP-1096-R2 - Klamath Project - Tule Lake Division - Modoc Unit. Reinforcing steel and forms are in place; January 29, 1945; Photo by R. S. Hopkins
    Citation
  • 1442
    KP-1100-R2 - Klamath Project. The vertical cracks were present before excavation, indicating a shrinkage during a period after the initial deposition, possibly after the withdrawal of Tule Lake; March ...
    Citation
  • 1435
    KP-1093-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Considerable water was encountered and two 6" and two 10" pumps were required to dewater the hole. After dewatering was completed and the ...
    Citation
  • 1441
    KP-1099-R2 - Klamath Project. Vertical cracks, varying in width up to 3" form subterranean channels for flow of water. Approximately 1/4 sec. ft. of water is shown flowing from the crack. The top surface ...
    Citation