151. [Image] TULELAKE IRRIGATION DISTRICT - Small pumping plant
KP-2408-R2 - TULELAKE IRRIGATION DISTRICT - Klamath Project. Small pumping plant which pumps water from No. 45 drain into J-11 lateral. This type is called a "box pump" locally. The vertical column is ...Citation -
KP-2414-R2 - ENTERPRISE POWER PLANT - Klamath Project. Looking upstream to afterbay showing hole washed out during 1957 irrigation season. Rocks in draft tube were washed down from repair made in forebay; ...
Citation -
153. [Image] TULE LAKE SUMP - Sump sounding
KP-2416-R2 - TULE LAKE SUMP - Klamath Project. Sump was sounded to determine elevation of bottom for planning studies. Airboat rented from Fish and Wildlife Service, was used due to shallow depth. Burt ...Citation -
154. [Image] TULE LAKE SUMP - Sump sounding job
KP-2417-R2 - TULE LAKE SUMP - Klamath Project. Lynn Skeen at triangulation station operating plane table on which sounding courses have been plotted. When air boat stopped to make sounding a flag was waved ...Citation -
KP-2421-R2 - ENTERPRISE POWER PLANT - Klamath Project. View of forebay looking northwest to lining on west side. Lining has started to fail due to pumping action of turbulent water. Power Plant was not ...
Citation -
KP-2442-R2 - ENTERPRISE POWER PLANT - Klamath Project. Forebay showing hole on west side after loose rockfill had been removed. Rockfill had been dumped in hole after paving collapsed during 1957 irrigation ...
Citation -
157. [Image] Klamath Project Office - Project employees
KP-2443-R2 - KLAMATH PROJECT--Klamath Project Office. Project employees, from left to right, front row: R.G. Comstock, K.J. Greene, W.G. Ely, D.E. Bunger, L.McAnulty, B. Mitchell, D.A.Gray, C.D.Lawrence, ...Citation -
158. [Image] Bureau of Reclamation employees with 10 years of Government service, taken on presentation of service pins
KP-2445-R2 - KLAMATH PROJECT - Bureau of Reclamation employees with 10 years of Government service, taken on presentation of service pins. From left to right, front row: R. G. Comstock, J. Anderson, F. ...Citation -
159. [Image] TULE LAKE SUMP 3, Specs. DC-5621
P12-200-2662 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b Lateral, Sta. 54. 1 1/2 cu yard Link Belt Dragline building normal bank on top of lining. Material will be smoothed ...Citation -
160. [Image] P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10
P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10. View looking north, pump has drawn down existing drain removing old silt deposits; June 2, 1962; Photo ...Citation