Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Greene, K.J.
Remove constraint Author: Greene, K.J.
« Previous | 141 - 150 of 189 | Next »
Search Results
-
141. [Image] PUMPING PLANT 9, TULE LAKE SUMP 2
KP-2542-R2 - Klamath Project - PUMPING PLANT 9, TULE LAKE SUMP 2. View of pumping unit and plant. Pumping unit has been assembled and is ready for installation; December 9, 1959; Photo by K.J. GreeneCitation -
KP-2354-R2 - Klamath Project--BUTTE VALLEY IRRIGATION DISTRICT. Concrete-lined ditch; 8 yrs. old; 2 in. thick concrete. Butte Valley aggregate in good condition. NE Corner Sec. 25, R. 2 W., T. 46 N.; August ...
Citation -
143. [Image] TULE LAKE DIVISION - Sump 2
KP-2385-R2 - Klamath Project--TULE LAKE DIVISION. About 1500' south of pumping plant experimental drain, showing material in middle of drain which was pushed up evidently by pressure of adjacent banks. ...Citation -
144. [Image] TULE LAKE DIVISION - Sump 2
KP-2386-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant, looking N.W. to dragline which has been excavating material pushed up in bottom of drain. Bank has ...Citation -
145. [Image] TULE LAKE DIVISION - Sump 2
KP-2388-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant. Looking south to new bank subsidence in foreground and showing bank subsidence in backgroud which ...Citation -
KP-2392-R2 - Klamath Project--ENTERPRISE POWER PLANT. Fire in 1956 damaged the power house and the turbine is not in operation. Water for irrigation flows through the power house structure and bypass. ...
Citation -
147. [Image] TULE LAKE SUMP 2
KP-2396-R2 - Klamath Project--TULE LAKE SUMP 2. Drainage pumping plant constructed by Lessees for pumping from leases to Sump 1. Structural and foundation failure due to lack of structure to resist earth ...Citation -
148. [Image] CLEAR LAKE - Underwater soil sampling raft
KP-2402-R2 - CLEAR LAKE - Klamath Project. Soil sampling procedure. Veimeir soil sampling tube, about 1 1/8" in diameter being driven into soil on bottom of Clear Lake. The tube is inside 3" pipe which ...Citation -
149. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2404-R2 - CLEAR LAKE - Klamath Project. Pumping air into bottom section of vehmeir tube to extrude soil sample. Winch at right is used to lower and raise 3" pipe in center of raft. Small winch at corner ...Citation -
KP-2407-R2 - LANGELL VALLEY - Klamath Project. Drainage inlet culvert on northeast side of channel. Looking southwest, showing fill over inlet which was washed away during flood of January 1956; October ...
Citation