You searched for: Start Over Photos Remove constraint Photos Author Greene, K.J. Remove constraint Author: Greene, K.J. Subject Pumping Plant No. 9 (California) Remove constraint Subject: Pumping Plant No. 9 (California) Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California) Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 3543
    KP-2527-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking northeast towards discharge structure showing form work and discharge pipes; September 24, 1959; Photo by K.J. Greene
    Citation
  • 3559
    KP-2543-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to pumping plant intake showing removable motor deck sections and float switch well; December 9, 1959; Photo by K.J. Greene
    Citation
  • 3711
    KP-2617-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking northwest to pumping plant. 102-A-1 Drain on left and 102 Drain on right; July 7, 1961; Photo by K.J. Greene
    Citation
  • 3542
    KP-2526-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking north showing driving of sheet piling for structure. Sheet piling in background was driven by contractor to protect excavation; ...
    Citation
  • 3558
    KP-2542-R2 - Klamath Project - PUMPING PLANT 9, TULE LAKE SUMP 2. View of pumping unit and plant. Pumping unit has been assembled and is ready for installation; December 9, 1959; Photo by K.J. Greene
    Citation
  • 3560
    KP-2544-R2- Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to plant intake. The high motor deck is required when Sump 2 is flooded in years of high runoff; December 26, 1959; Photo ...
    Citation
  • 3561
    KP-2545-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of pumping units taken from bridge deck. Units are 25 cfs capacity at 15 feet head; December 26, 1959; Photo by K.J. Greene
    Citation
  • 3562
    KP-2546-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of motor deck. Motors are 60 H.P. Deck can be removed to permit removal of pumping units with mobile crane. Mr. Hunsicker of Mechanical ...
    Citation
  • 3563
    KP-2547-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View looking south, showing 30" diameter discharge lines and walkway. Walkway provides easy access from dike for plant operation and is necessary ...
    Citation