Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Greene, K.J.
Remove constraint Author: Greene, K.J.
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
« Previous | 161 - 170 of 175 | Next »
Search Results
-
161. [Image] CLEAR LAKE - Underwater soil sampling raft
KP-2402-R2 - CLEAR LAKE - Klamath Project. Soil sampling procedure. Veimeir soil sampling tube, about 1 1/8" in diameter being driven into soil on bottom of Clear Lake. The tube is inside 3" pipe which ...Citation -
162. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2404-R2 - CLEAR LAKE - Klamath Project. Pumping air into bottom section of vehmeir tube to extrude soil sample. Winch at right is used to lower and raise 3" pipe in center of raft. Small winch at corner ...Citation -
163. [Image] TULE LAKE SUMP - Sump sounding
KP-2416-R2 - TULE LAKE SUMP - Klamath Project. Sump was sounded to determine elevation of bottom for planning studies. Airboat rented from Fish and Wildlife Service, was used due to shallow depth. Burt ...Citation -
164. [Image] TULE LAKE SUMP - Sump sounding job
KP-2417-R2 - TULE LAKE SUMP - Klamath Project. Lynn Skeen at triangulation station operating plane table on which sounding courses have been plotted. When air boat stopped to make sounding a flag was waved ...Citation -
KP-2421-R2 - ENTERPRISE POWER PLANT - Klamath Project. View of forebay looking northwest to lining on west side. Lining has started to fail due to pumping action of turbulent water. Power Plant was not ...
Citation -
166. [Image] Klamath Project Office - Project employees
KP-2443-R2 - KLAMATH PROJECT--Klamath Project Office. Project employees, from left to right, front row: R.G. Comstock, K.J. Greene, W.G. Ely, D.E. Bunger, L.McAnulty, B. Mitchell, D.A.Gray, C.D.Lawrence, ...Citation -
167. [Image] Bureau of Reclamation employees with 10 years of Government service, taken on presentation of service pins
KP-2445-R2 - KLAMATH PROJECT - Bureau of Reclamation employees with 10 years of Government service, taken on presentation of service pins. From left to right, front row: R. G. Comstock, J. Anderson, F. ...Citation -
168. [Image] P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10
P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10. View looking north, pump has drawn down existing drain removing old silt deposits; June 2, 1962; Photo ...Citation -
169. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2544-R2- Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to plant intake. The high motor deck is required when Sump 2 is flooded in years of high runoff; December 26, 1959; Photo ...Citation -
170. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2545-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of pumping units taken from bridge deck. Units are 25 cfs capacity at 15 feet head; December 26, 1959; Photo by K.J. GreeneCitation