Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
Greene, K.J.
Remove constraint Author: Greene, K.J.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 51 - 60 of 64 | Next »
Search Results
-
51. [Image] SUMP 3 - TULE LAKE - Barley field
KP-2514-R2-Klamath Project -- SUMP 3 - TULE LAKE. Barley on lot 23, W1/2 of SW1/4 of Sec. 18, T47N, R5E, where experimental tile drains were installed in 1958, showing growth in southwest corner; July ...Citation -
52. [Image] TULE LAKE SUMP 2, PUMPING PLANT 9
KP-2526-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking north showing driving of sheet piling for structure. Sheet piling in background was driven by contractor to protect excavation; ...Citation -
53. [Image] PUMPING PLANT 9, TULE LAKE SUMP 2
KP-2542-R2 - Klamath Project - PUMPING PLANT 9, TULE LAKE SUMP 2. View of pumping unit and plant. Pumping unit has been assembled and is ready for installation; December 9, 1959; Photo by K.J. GreeneCitation -
54. [Image] TULE LAKE DIVISION - Sump 2
KP-2385-R2 - Klamath Project--TULE LAKE DIVISION. About 1500' south of pumping plant experimental drain, showing material in middle of drain which was pushed up evidently by pressure of adjacent banks. ...Citation -
55. [Image] TULE LAKE DIVISION - Sump 2
KP-2386-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant, looking N.W. to dragline which has been excavating material pushed up in bottom of drain. Bank has ...Citation -
56. [Image] TULE LAKE DIVISION - Sump 2
KP-2388-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant. Looking south to new bank subsidence in foreground and showing bank subsidence in backgroud which ...Citation -
57. [Image] TULE LAKE SUMP 2
KP-2396-R2 - Klamath Project--TULE LAKE SUMP 2. Drainage pumping plant constructed by Lessees for pumping from leases to Sump 1. Structural and foundation failure due to lack of structure to resist earth ...Citation -
58. [Image] P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10
P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10. View looking north, pump has drawn down existing drain removing old silt deposits; June 2, 1962; Photo ...Citation -
59. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2544-R2- Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to plant intake. The high motor deck is required when Sump 2 is flooded in years of high runoff; December 26, 1959; Photo ...Citation -
60. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2545-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of pumping units taken from bridge deck. Units are 25 cfs capacity at 15 feet head; December 26, 1959; Photo by K.J. GreeneCitation