Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Greene, K.J. Remove constraint Author: Greene, K.J. Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California) Subject Tule Lake Sump (California) Remove constraint Subject: Tule Lake Sump (California) Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 3527
    KP-2514-R2-Klamath Project -- SUMP 3 - TULE LAKE. Barley on lot 23, W1/2 of SW1/4 of Sec. 18, T47N, R5E, where experimental tile drains were installed in 1958, showing growth in southwest corner; July ...
    Citation
  • 3542
    KP-2526-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking north showing driving of sheet piling for structure. Sheet piling in background was driven by contractor to protect excavation; ...
    Citation
  • 3558
    KP-2542-R2 - Klamath Project - PUMPING PLANT 9, TULE LAKE SUMP 2. View of pumping unit and plant. Pumping unit has been assembled and is ready for installation; December 9, 1959; Photo by K.J. Greene
    Citation
  • 3269
    KP-2385-R2 - Klamath Project--TULE LAKE DIVISION. About 1500' south of pumping plant experimental drain, showing material in middle of drain which was pushed up evidently by pressure of adjacent banks. ...
    Citation
  • 3270
    KP-2386-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant, looking N.W. to dragline which has been excavating material pushed up in bottom of drain. Bank has ...
    Citation
  • 3272
    KP-2388-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant. Looking south to new bank subsidence in foreground and showing bank subsidence in backgroud which ...
    Citation
  • 57. [Image] TULE LAKE SUMP 2
    3280
    KP-2396-R2 - Klamath Project--TULE LAKE SUMP 2. Drainage pumping plant constructed by Lessees for pumping from leases to Sump 1. Structural and foundation failure due to lack of structure to resist earth ...
    Citation
  • 3761
    P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10. View looking north, pump has drawn down existing drain removing old silt deposits; June 2, 1962; Photo ...
    Citation
  • 3560
    KP-2544-R2- Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to plant intake. The high motor deck is required when Sump 2 is flooded in years of high runoff; December 26, 1959; Photo ...
    Citation
  • 3561
    KP-2545-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of pumping units taken from bridge deck. Units are 25 cfs capacity at 15 feet head; December 26, 1959; Photo by K.J. Greene
    Citation