Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
Greene, K.J.
Remove constraint Author: Greene, K.J.
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
1 - 7 of 7
Search Results
-
KP-2406-R2 - CLEAR LAKE - Klamath Project. Dave Bunger is sighting two buoys with a sextant. At least 3 located points are used for a fix on the map; October 16, 1957; Photo by K. J. Greene
Citation -
KP-2434-R2 - ENTERPRISE POWER PLANT - Klamath Project. Placing compacted earth fill on west side of forebay using Barco gas operated tampers; March 15, 1958; Photo by K. J. Greene
Citation -
KP-2435-R2 - ENTERPRISE POWER PLANT - Klamath Project. The forced air fuel oil heater used for concrete protection is shown in foreground; March 11, 1958; Photo by K. J. Greene
Citation -
4. [Image] TULE LAKE SUMP 3 - 101-C Drain
P12-200-2681 - Klamath Project, California - TULE LAKE SUMP 3 - 101-C Drain. View of equipment putting aqualine herbicide in drain to kill moss. Forty parts per million were used and was effective; July ...Citation -
KP-2404-R2 - CLEAR LAKE - Klamath Project. Pumping air into bottom section of vehmeir tube to extrude soil sample. Winch at right is used to lower and raise 3" pipe in center of raft. Small winch at corner ...
Citation -
6. [Image] TULE LAKE SUMP - Sump sounding
KP-2416-R2 - TULE LAKE SUMP - Klamath Project. Sump was sounded to determine elevation of bottom for planning studies. Airboat rented from Fish and Wildlife Service, was used due to shallow depth. Burt ...Citation -
7. [Image] TULE LAKE SUMP - Sump sounding job
KP-2417-R2 - TULE LAKE SUMP - Klamath Project. Lynn Skeen at triangulation station operating plane table on which sounding courses have been plotted. When air boat stopped to make sounding a flag was waved ...Citation