    KP-1882 - Klamath Project. N-16 Lateral. Lower Cost Canal Lining. Photo shows channel in distance with George L. Browning in the foreground painting the edge of the first asphalt strip with a solvent ...
    Citation
  • 2379
    KP-1876 - Klamath Project. J-Canal Wasteway; November 22, 1949; Photo by Andrew M. Bergloff
    Citation
  • 2386
    KP-1883 - Klamath Project. N-16 Lateral. Lower cost canal lining. This shows further progress in painting of joints; December 8, 1949; Photo by Andrew M. Bergloff
    Citation
  • 2388
    KP-1885 Klamath Project. Lower cost canal lining. Heating the solvent compound to seal overlapping edges. George L. Browning holding torch; December 8, 1949; Photo by Andrew M. Bergloff
    Citation
  • 2390
    KP-1887 - Klamath Project. N-16 Lateral. Lower cost canal lining. Experiment in sealing of joints by reversing alternate strips to obtain asphalt to asphalt contact; December 8, 1949; Photo by Andrew ...
    Citation
  • 2392
    KP-1889 - Klamath Project. Lower cost canal lining. This picture shows the laying of an asphalt strip after each end had been dipped in solvent compound; December 8, 1949; Photo by Andrew M. Bergloff...
    Citation
  • 2393
    KP-1890 - Klamath Project. Lower cost canal lining. Laying of asphalt with paper side up. (Close-up); December 8, 1949; Photo by Andrew M. Bergloff
    Citation
  • 2421
    KP-1919 - Klamath Project. Pumping Plant "Q". Construction. Showing unit compartments. Messrs. Pitts and Browne inspecting; February 12, 1950; Photo by Andrew M. Bergloff
    Citation
  • 2461
    KP-1942 - Klamath Project. Miller Creek, Langell Valley. Pile driving inspected by L. Petzoldt; April 27, 1950; Photo by Andrew M. Bergloff
    Citation
  • 2387
    KP-1884 - Klamath Project. N-16 Lateral. Lower cost canal lining. Laying of second strip of asphalt membrane with approximately 2-inch overlap. George L. Browning and L. G. Oliensis on far side of ...
    Citation