  • 2403
    KP-1900 - Klamath Project. Lower Cost Canal Lining. Looking upstream. George L. Browning inspecting; December 14, 1949; Photo by Andrew M. Bergloff
    Citation
  • 2404
    KP-1902 - Klamath Project. Lower cost canal lining. Picture shows the inside of the box car in which the asphalt was transported. Bracing in the center of the car was to hold the rolls steady; December ...
    Citation
  • 2405
    KP-1903 - Klamath Project. Lower cost canal lining. Padded section laid back and the asphalt rolls are exposed for unloading; December 14, 1949; Photo by Andrew M. Bergloff
    Citation
  • 2462
    KP-1943 - Klamath Project. Miller Creek, Langell Valley. Pile driving, hammer and guide also in this picture. Petzoldt inspecting; April 27, 1950; Photo by Andrew M. Bergloff
    Citation
  • 2616
    KP-1979-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture taken from southwest side showing piledriver in position to drive last pile. Charles T. Hover, contractor; June 15, ...
    Citation
  • 2617
    KP-1980-R2 - Klamath Project. Telephoto. Lost River Channel Improvement, Langell Valley. Picture taken from southwest side showing top of pile and hammer after pile is driven; June 15, 1950; Photo by ...
    Citation
  • 2682
    KP-1997-R2 - Klamath Project. Lost River Diversion Channel. Satisfactory compaction is obtained from weight of cat tracks and from pressure under the bid [sic -?] carryall tires. Sta. 360-00. Looking ...
    Citation
  • 2683
    KP-1998-R2 - Klamath Project. Lost River Diversion Channel. The machines are building and compacting foundation for county road. This will also serve as the south bank of the new Diversion Channel, Sta. ...
    Citation
  • 2684
    KP-1999-R2 - Klamath Project. Lost River Diversion Channel. Picture shows contractor's (Stacy) earth moving and compacting equipment as they stand on newly constructed County Road and south bank of new ...
    Citation
  • 2685
    KP-2000-R2 - Klamath Project. Lost River Diversion Channel. Picture shows close-up of good compaction tool - the rear tire of the 16-yard carryall unit. Pressure from the cushioned tire causes an even ...
    Citation